https://www.mfssinterior.in
919718838931

Hotel Construction Work In Vasundhara Sector 19 Ghaziabad

Here’s a c
2025-11-01T07:13:33
MFSS INTERIOR DECORATOR
Hotel Construction Work In Vasundhara Sector 19 Ghaziabad

Here’s a comprehensive list of hotel construction work — from site preparation to interior finishing and final commissioning. This covers all major trades and activities involved in building a hotel, whether it’s a small boutique property or a multi-story commercial hotel. 🧱 1. Pre-Construction Phase Site survey and soil testing Architectural and structural design Civil, electrical, plumbing, HVAC, and fire-fighting system designs Regulatory approvals and permits Budget estimation and tendering Project timeline and resource planning 🚜 2. Site Preparation & Foundation Site clearing and leveling Temporary site office setup Excavation and backfilling Foundation work (footings, pile foundation, or raft) Basement construction (if applicable) Foundation waterproofing 🏗️ 3. Structural Work RCC columns, beams, and slabs Structural framework for multiple floors Staircase and lift shaft construction Roof slab casting and curing Masonry walls (external and internal) Structural steel fabrication (for canopy, atrium, etc.) ⚙️ 4. Civil & Masonry Work Brick/block work for walls Plastering (internal and external) Waterproofing (bathrooms, roof, and basements) False ceiling framework preparation Flooring base (screed layer) ⚡ 5. Electrical Work Power distribution layout and wiring Main panel board installation Sub-panels for each floor/zone Light points, switches, and sockets Backup generator setup Fire alarm system and emergency lighting CCTV, networking, and intercom cabling 💧 6. Plumbing & Sanitary Work Water supply and drainage pipelines Hot water system (solar, heat pump, or boiler) Sanitary fittings installation Rainwater harvesting system STP (Sewage Treatment Plant) installation RO and water filtration systems 🌡️ 7. HVAC (Heating, Ventilation & Air Conditioning) Chiller plant or VRV/VRF system installation AHU and FCU installation Ducting and insulation work Air diffusers and grills fitting Exhaust and fresh air systems 🔥 8. Fire-Fighting & Safety Systems Sprinkler system installation Fire hydrant and hose reel system Fire alarm and smoke detector setup Emergency exit signage and lighting Fireproof doors and stair pressurization 🚪 9. Finishing Work Internal plaster and wall putty Painting (primer, finish coats, decorative finishes) Flooring (tiles, marble, vinyl, or carpet) Ceiling finishes (POP, gypsum, metal) Joinery work (doors, windows, skirting) 🪵 10. Carpentry & Furniture Reception counter and lobby furniture Guest room wardrobes, beds, and tables Restaurant and bar counters Conference hall furniture Modular kitchen (if applicable) Doors, frames, and decorative panels 🪟 11. Glazing & Façade Work Aluminum or UPVC window installation Glass façade and curtain wall systems ACP cladding and external paneling Canopies and skylights 💡 12. Interior Design & Fit-Out Guest room décor and layout Lighting design and installation Lobby, restaurant, and corridor finishes Artwork and interior accessories Curtains, blinds, and upholstery 🧯 13. External & Landscape Work Paving, pathways, and driveways Boundary wall and gates Landscaping and garden setup Outdoor lighting and signage Water features or pools (if applicable) ⚙️ 14. MEP Commissioning Testing of all electrical circuits Plumbing and water pressure tests Fire safety and alarm testing HVAC balancing and performance check Lift installation and testing 🧹 15. Final Stage & Handover Deep cleaning and polishing Final paint touch-ups Furniture and fixture placement Equipment testing and commissioning Quality and safety inspection Project handover to operations team Would you like me to turn this into a professional “Hotel Construction Work Breakdown Structure (WBS)” in Excel or PDF format — categorized with columns for duration, responsible team, and cost? It’s perfect for contractors, engineers, or project managers.

Message Us

other updates

Book Appointment

No services available for booking.

Select Staff

AnyBody

Morning
    Afternoon
      Evening
        Night
          Appointment Slot Unavailable
          Your enquiry
          Mobile or Email

          Appointment date & time

          Sunday, 7 Aug, 6:00 PM

          Your Name
          Mobile Number
          Email Id
          Message

          Balinese massage - 60 min

          INR 200

          INR 500

          products True True +918042755762